Well, almost 3 years later, we're finally done with our basement remodel project. We tried to do as much as possible ourselves to save on money. Of course, this added time, b/c we got so frustrated and tired of it at times that we'd go for a couple months without doing anything down there. But, for the most part, we're done now, and there are only a few random finishing touches that need to be finalized.
This first post shows the bathroom before and after. (I think you can probably tell which ones are before, and which are after.) See the next post for pics of the bedroom and the main part of the basement.
We had to totally gut the bathroom, b/c the draintile bulldozed through the toilet and shower areas. We re-sheetrocked, tiled, bought new light fixtures, faucets, sink, toilet, everything.




No comments:
Post a Comment